← All workUnder implementationJune–December 2025

Rachana Products · Packaging operations

Packaging improvement at Rachana Products

Selecting filling equipment and preparing a packaging process for change.

Result so far

Process mapping and equipment research informed the implementation plan. Completed operating improvements have not been established here.

My contribution

I mapped the process, investigated material-control gaps and compared filling equipment and vendors. I helped prepare the implementation plan and operating checks.

01 / The problem

Where it started.

At Rachana Products, I worked on a packaging process that relied heavily on manual filling. The equipment change was not complete during my role.

The decision

Choose equipment suited to the product and plan the training, responsibilities and operating checks needed to run it.

02 / The approach

How I worked through it.

  1. 01

    Map the filling process and material movement.

  2. 02

    Compare equipment for product compatibility, fill range, servicing and training.

  3. 03

    Support implementation and define responsibilities.

  4. 04

    Plan checks for output, fill accuracy, rework and maintenance.

Workflow

How it works

  1. 01Map

    Understand the existing process and material movement.

  2. 02Compare

    Assess equipment and vendor requirements.

  3. 03Implement

    Support installation, responsibilities and training.

  4. 04Measure

    Check actual performance after the change is running.

03 / The evidence

What the work produced.

Completed work

Process reviewMapped material movement and responsibility gaps.

Decision support

Vendor comparisonCompared filling equipment and implementation requirements.

Current stage

In progressImplementation is underway; operating results are not yet established.

This case describes work in progress. It does not claim a completed speed increase, labour redeployment or realised savings.

04 / Looking back

What I took away.

The work so far is in diagnosis, equipment selection and implementation support. Production and financial results need to be measured after the change is running.

  • Equipment selection needs to account for servicing, operator training and the products being filled.

What I would measure next

Establish a baseline, then measure output, uptime, fill accuracy, rework and actual costs once the line is operating.

Scope & confidentiality

Customer information, formulas, employee identities, commercial rates and security-sensitive layouts are excluded.